Gallery

  • Hannibal site view during power plant construction – boiler (HRSG) erection
    Hannibal site view during power plant construction – boiler (HRSG) erection
  • Preparing to offload 614 MVA generator from on-site loop track
    Preparing to offload 614 MVA generator from on-site loop track
  • Site overview during power plant construction, looking southeast
    Site overview during power plant construction, looking southeast
  • Site overview during power plant construction, looking northeast
    Site overview during power plant construction, looking northeast
  • Site overview during power plant construction, looking east
    Site overview during power plant construction, looking east
  • Construction progress - circ water pumps and building steel
    Construction progress - circ water pumps and building steel
  • Construction progress - cooling tower chem feed area, 11,000-ton crawler crane used for HRSG modules
    Construction progress - cooling tower chem feed area, 11,000-ton crawler crane used for HRSG modules
  • Power plant construction – HRSG and pipe rack activities
    Power plant construction – HRSG and pipe rack activities
  • Power plant construction – combustion turbine air inlet, pipe rack, turbine building
    Power plant construction – combustion turbine air inlet, pipe rack, turbine building
  • Power plant construction – turbine building interior – condenser, steam turbine, generator, lube oil system
    Power plant construction – turbine building interior – condenser, steam turbine, generator, lube oil system
  • Power plant construction – west side of HRSG
    Power plant construction – west side of HRSG
  • Power plant construction – placing top section of exhaust stack at 223 feet above site elevation
    Power plant construction – placing top section of exhaust stack at 223 feet above site elevation
  • West side of completed HRSG, looking south. Combustion turbine fuel gas skids at lower left
    West side of completed HRSG, looking south. Combustion turbine fuel gas skids at lower left
  • Turbine building interior with combined lube oil system at ground level and equipment pedestals supporting (near to far) steam turbine, generator, and combustion turbine
    Turbine building interior with combined lube oil system at ground level and equipment pedestals supporting (near to far) steam turbine, generator, and combustion turbine
  • Adjacent 138,000 volt grid interconnection constructed by Long Ridge
    Adjacent 138,000 volt grid interconnection constructed by Long Ridge
  • Power plant nearing completion – aerial view looking west
    Power plant nearing completion – aerial view looking west
  • Control room operations, 24/7/365
    Control room operations, 24/7/365
  • NAES technicians adjusting hydrogen fuel blending system components
    NAES technicians adjusting hydrogen fuel blending system components
  • Catwalk at the Ohio River to cooling water intake
    Catwalk at the Ohio River to cooling water intake
  • Power plant operations – looking north – showing continuous emissions monitoring equipment enclosure at the base of the stack
    Power plant operations – looking north – showing continuous emissions monitoring equipment enclosure at the base of the stack
  • Power plant operations – looking east showing Isophase bus ducts to step-up transformer
    Power plant operations – looking east showing Isophase bus ducts to step-up transformer
  • Power plant aerial view – looking east, showing Ohio River infrastructure and sand barge operations
    Power plant aerial view – looking east, showing Ohio River infrastructure and sand barge operations
  • Power plant operations – looking west across cooling tower to HRSG, pipe rack, and turbine building
    Power plant operations – looking west across cooling tower to HRSG, pipe rack, and turbine building